Quality & Compliance

Certificates, not adjectives

Every claim on this site can be checked against a document. Certificates are issued with each offer; factory audits and third-party inspection are welcome.

Certificates

What we hold

Scope and validity are stated on the certificate itself — we send the full documents, not just logos.

TÜV SÜD SIL3 functional safety certificate
TÜV SÜD · Functional Safety SIL3
ATEX certificate II 1G Ex ia IIC T4
ATEX · II 1G Ex ia IIC T4
NEPSI explosion proof certificate
NEPSI · Explosion-proof
EAC customs union certificate
EAC · Customs Union
ISO 9001 quality management certificate
ISO 9001 · Quality Management
+ IECEx · ISO 14001 · ISO 45001
full set supplied with quotation
Manufacturing

Built and tested in our own plant

Design, machining, assembly and calibration under one roof in Wuhan. Every unit is calibrated and stroke-tested before packing; serial numbers trace the build and calibration record.

  • 100% calibration and functional test before shipment
  • Air consumption and leak test on every unit
  • Serialised calibration records retained
  • Design service life: 10 years
  • 15 years of nozzle-flapper engineering, in-house R&D
  • 36 intellectual property rights: 7 invention patents, 16 utility models, 12 software copyrights
TOP-5879F1 positioners lined up on the production test bench
Track Record

Where the platform is already running

Selected references. Client names are shared during commercial discussion where confidentiality permits.

⚡

Power · 600 MW and 1000 MW units

Retrofit of imported positioners across 600 MW-class units; turbine bypass service on 1000 MW units.

⛽

Offshore platforms

316L stainless series selected for offshore oil platforms in the CNOOC system.

🏭

Coking / metallurgy

Positioner life extended from about six months to four years on coking service at a major steel group.

◈

Chemical projects

Batch installations in chlorinated paraffin and fine-chemical projects — hundreds of units per plant.

☢

Nuclear sector

Supplied into nuclear-sector projects; 2025 entry in the petrochemical & chemical instrumentation catalogue.

◍

Air separation

Cryogenic service with low-temperature configuration; custom builds to −60 °C for cold-climate projects.

Internal main board of Torleo positioner
Engineering

Why nozzle-flapper in 2026

It is not the fashionable architecture — it is the one that survives dirty air, heat and vibration with the fewest failure modes. No fragile front-end electronics exposed to ambient heat; a mechanical position loop; a sealed air circuit.

Where electronics do appear — HART 7 diagnostics, LCD, limit contacts, surge protection — they serve maintenance decisions, not the control loop itself.

  • Steady-state air 36 L/h — meaningfully less compressor load than typical high-bleed designs
  • Tubeless internal air circuit: fewer fittings, fewer leaks, no condensation traps
  • Fail-in-place without an external solenoid / lockup stack

Audit us.

Factory visit, third-party inspection before shipment, or a sample unit on trial — all welcome. We would rather you verify than trust a brochure.

Arrange a factory visit
✆